From: SatNews
The hardware arrived aboard the MN Colibri, which is one of two sea-going roll-on/roll-off ships used for the transport of launcher components from Europe and Russia to French Guiana. With this latest delivery, the Spaceport now is “home” to four Soyuz vehicles, beginning with the completed VS03 launcher that is ready for an afternoon departure tomorrow with a pair of Galileo In-Orbit Validation (IOV) navigation satellites.
As the countdown continues for VS03, preparations are moving into full swing for late November’s VS04 flight, to carry France’s Pléiades 2 very high resolution optical observation satellite. Build-up of the basic three-stage Soyuz for VS04 will be initiated next week in the Spaceport’s MIK assembly building, while this mission’s Fregat upper stage has completed its checkout in the MIK facility and is now ready for transfer to the S3B clean room for fueling during the coming week.
Delivered this month was hardware for the fourth, fifth and sixth Soyuz flights to be performed from the Spaceport—designated VS04, VS05 and VS06 in Arianespace’s launcher family numbering system. This includes the third stage and payload fairing for Arianespace’s VS04 flight, scheduled in November; along with the first, second and third stages, Fregat upper stages and payload fairings for the VS05 and VS06 Soyuz missions, planned for 2013. The hardware arrived aboard the MN Colibri, which is one of two sea-going roll-on/roll-off ships used for the transport of launcher components from Europe and Russia to French Guiana.
With this latest delivery, the Spaceport now is “home” to four Soyuz vehicles, beginning with the completed VS03 launcher that is ready for an afternoon departure tomorrow with a pair of Galileo In-Orbit Validation (IOV) navigation satellites. As the countdown continues for VS03, preparations are moving into full swing for late November’s VS04 flight, to carry France’s Pléiades 2 very high resolution optical observation satellite.
Build-up of the basic three-stage Soyuz for VS04 will be initiated next week in the Spaceport’s MIK assembly building, while this mission’s Fregat upper stage has completed its checkout in the MIK facility and is now ready for transfer to the S3B clean room for fueling during the coming week.
No comments:
Post a Comment